StatRapid used on instrumented piles for optimization of design parameters for high rise building in The Hague
Author(s): van Dorp, van Delft, IJnsen Year: 2019 Language: English Where: Pfahl-Symposium 2019, Braunschweig ABSTRACT: For a new high-rise development in the center of The Hague (NL), heavily [...]
International Prediction Event Behaviour of Cfa, Driven and Bored Piles in Residual Soil Experimental Site
Author(s): Viana da Fonseca, Santos, A. Year: 2008 Language: English Where: ISC’2,September 2008 / 240×170 / 688 pages ISBN: 978-972-752-104-3 ISBN: 978-98995625-1. INTRODUCTION: In the [...]
2015 Wikinger Test Program – Baltic Sea – Germany
To optimize and certify the final design of the Wikinger Offshore Wind Farm (OWF) in the Baltic Sea near the German island of Ruegen, the project owner, Iberdrola Renewables, initiated a [...]
Hong Kong-Zhuhai-Macau Bridge, China
Allnamics has been involved in the construction of two artificial islands for the bridge-tunnel-bridge connection between Hong Kong and Macau. Allnamics performed the vibratory driving [...]
Rapid Pile Load Testing in Barcelona
Pruebas de carga rápida de pilotes en Barcelona Auteur(s): Moscoso del Prado Mazza; Fernández Tadeo; Bielefeld; Year: 2018 Language: Español Where: Obras Urbanas sept – oct 2018 nr 71 [...]
Recent advances of rapid load testing in Asia and Europe
Autor(s): Chew, S.H.; Middendorp, P.; Bakker J.; Chua G. Year: 2015 Language: English Where: Proceedings XVI European Conference on Soil Mechanics and Geotechnical Engineering, Edinburgh, [...]
PDA and DLT Cartagena, Colombia
For the highway from Cartagena to Barranquila, Colombia, the approx. 6 km long bridge “Viaducto Gran Manglar” is built just north of Cartagena through a shallow lagoon with mangroves. Mangroves [...]
StatRapid measurements near Brugge Belgium
Using the 8 MN StatRapid Allnamics performed Rapid Load Testing on steel pipe piles for the foundation of the movable bridge over the Boudewijn Canal near Brugge in Belgium in March 2015. The [...]
Dynamic Pile Testing for Amstel Towers Hotel in Amsterdam
In April 2016 Allnamics performed PDA-monitoring and DLT-testing for our client Voorbij Funderingstechniek BV, for the Amstel Towers Hotel near the Amstel station in Amsterdam. The tests were [...]