Overview projects
General Crack monitoring Dutch home in Alphen aan den Rijn – 2017/2019 Pile Driving Analysis (PDA) PDA and DLT Cartagena, Colombia – 2017/2018 PDA and VM monitoring for research [...]
General Crack monitoring Dutch home in Alphen aan den Rijn – 2017/2019 Pile Driving Analysis (PDA) PDA and DLT Cartagena, Colombia – 2017/2018 PDA and VM monitoring for research [...]
On 8 and 9 May 2018 large diameter HEK tube piles, part of the foundation of the Sonate-Adagio building in the inner-city of The Hague, The Netherlands, were tested  by means of a Rapid Load Test [...]
Autor(s): Chew, S.H.; Middendorp, P.; Bakker J.; Chua G. Year: 2015 Language: English Where: Proceedings XVI European Conference on Soil Mechanics and Geotechnical Engineering, Edinburgh, [...]
Using the 8 MN StatRapid Allnamics performed Rapid Load Testing on steel pipe piles for the foundation of the movable bridge over the Boudewijn Canal near Brugge in Belgium in March 2015. The [...]
In February 2015 Allnamics trained 6 staff members of BAM international in the use of the Allnamics’ PDR for proper data acquisition during Pile Driving Analysis and Dynamic Load Testing. As [...]
The high quality acceleration sensors range from low to high levels of accelerations. Depending on its application, one of the high end accelerometers is suitable to perform the test. 50g – [...]
Beginning of 2018, preliminary piles have been tested for the foundation of a new building ‘Sonate Adagio’ in the centre of The Hague. The so called HEKbuispalen have been tested with [...]