After several attempts to reach the building location at the North Sea, finally Allnamics were able to monitor the pile driving process during installation of the huge piles as part of the foundation of wind turbines, at an offshore wind farm somewhere near the cost of Scotland. The measurements were performed during driving (PDM – pile driving monitoring) and at a redrive after the setup period (DLT – Dynamic Load Testing), using Allnamics PDR. The last signals were analysed with AllWave-DLT software for the Signal Matching process. As a result the bearing capacity of the pile have been determined.

Start typing and press Enter to search